DIMS Test Plan
latest
  • 1. Scope
  • 2. Referenced documents
  • 3. Software test environment
  • 4. Test identification
  • 5. Test schedules
  • 6. Requirements traceability
  • 7. Notes
  • 8. License
  • 9. Appendices
DIMS Test Plan
  • Docs »
  • DIMS Test Plan v 2.9.1
  • Edit on GitHub

DIMS Test Plan v 2.9.1¶

  • 1. Scope
    • 1.1. Identification
    • 1.2. CSCI capability requirements
    • 1.3. System overview
    • 1.4. Software System Test Strategy (General)
    • 1.5. Document overview
  • 2. Referenced documents
  • 3. Software test environment
    • 3.1. UW Tower server room
    • 3.2. Software items
    • 3.3. Hardware and firmware items
    • 3.4. Proprietary nature, acquirer’s rights, and licensing
    • 3.5. Installation, testing, and control
    • 3.6. Participating organizations
    • 3.7. Orientation plan
    • 3.8. Tests to be performed
  • 4. Test identification
    • 4.1. General information
    • 4.2. General test conditions
    • 4.3. Planned tests
  • 5. Test schedules
  • 6. Requirements traceability
  • 7. Notes
    • 7.1. Glossary of Terms
    • 7.2. List of Acronyms
  • 8. License
  • 9. Appendices
    • 9.1. Test Dashboard server VM
    • 9.2. Creating Tupelo server VM
    • 9.3. Installing Tupelo client
    • 9.4. Planning tests with JIRA
    • 9.5. Generating a Test Report with the report generation utility
    • 9.6. Using bats for Producing and Executing Tests
    • 9.7. Using DIMS Bash functions in Bats tests

Contact¶

Section author: Dave Dittrich <dittrich @ u.washington.edu>, Stuart Maclean <stuart @ apl.washington.edu>, Linda Parsons <linda.parsons @ nextcentury.com>

Next

© Copyright 2014, 2016 University of Washington. Revision 5ff899d9.

Built with Sphinx using a theme provided by Read the Docs.
Read the Docs v: latest
Versions
latest
Downloads
pdf
htmlzip
epub
On Read the Docs
Project Home
Builds

Free document hosting provided by Read the Docs.